Dune Creek MHC

9801 US-12, Michigan City 46360

mbartee@olycm.com

Office: (269) 235-9015

Dune Creek - New Water System

11/10/2026

Dear Residents,

We are replacing the underground water lines in Dune Creek next year.

What it costs you. There is no additional cost to you. We’ve been setting aside lot rent income for this project since we bought the community in 2023, and there will be no change to our typical annual increases because of it.

How your water works. Your water comes from Michigan City. It runs through a master meter in a pit at the front of the community. From there, the underground pipes that carry water to each home belong to the community. Those are the pipes we’re replacing. Your water source is not changing.

Why. The current lines are old and getting harder to repair. The new system will include new main lines and a new line to each home.

In the meantime. We are still working to find an underground leak in the current system. You may see our maintenance team checking lines, temporarily removing skirting, and digging in a few spots. If you notice standing water, a wet spot that won’t dry, or water bubbling up from the ground, please call the office right away.

Timeline.

•    Now through December: Survey and design. We’re working with a civil engineer to survey the community and design the new system. You may see crews walking the community, marking the ground with paint and flags, and digging small test holes. Please leave all marks and flags in place.

•    This winter: The State of Indiana reviews and approves the plans.

•    Late spring/early summer 2027: A large excavation contractor builds the new system. Construction is expected to take about 4 weeks.

What to expect. Your water will stay on during the project. The new system will be built alongside the current one, so your service isn’t interrupted while crews work. The new water mains will run along the curb for some homes and behind homes for others. Most of the new lines will be installed underground by boring, which means fewer open trenches. Some trenching and small holes will be needed. Crews will fill and restore any areas they dig. When the new system is finished, each home will be switched over to the new lines. If that switch requires a brief shutoff at your home, we’ll give you written notice ahead of time.

What we need from you. Nothing right now. We’ll send more details before construction starts.

Questions? Call the office at (269) 235-9015 or email mbartee@olycm.com. If you know of a leak or past repair at your home, please let us know.

Thank you for your patience as we make this improvement to Dune Creek.

Best regards,

Meagan

(269) 235-9015

Olympia Community Management